Independent pre-handover inspections · Cyprus

Move in with confidence. Not surprises.

We inspect your new apartment or house in Cyprus before you accept the keys. Professional tools, 100+ checks, every defect photographed, rated and pinned on your plan. From €650 + VAT.

Report in 5 working days, in 6 languagesPaid only by the buyerLimassol · Paphos · Larnaca · Nicosia
Defect plan from a real CheckIT report: 63 defects pinned on the floor plan of a 2-bedroom apartment in Limassol
Real report: 63 defects pinned on the plan of a 2-bedroom apartment, Limassol, July 2026
Reviews

What clients say

Examples of the reviews we receive.

We had walked through the apartment twice and seen nothing. CheckIT logged 41 items in one afternoon, with the level and the socket tester in the photos. The developer fixed 36 of them before we signed.
Anna, 2-bedroom apartment, Limassol
The thermal camera showed a damp patch behind the en-suite wall that nobody could see. That single finding was worth more than the whole fee.
Michael, Penthouse, Paphos
Booked on Monday, inspected on Wednesday, report the following Tuesday. Numbered, photographed, pinned on the plan. I forwarded it to the developer exactly as it was.
Elena, 3-bedroom apartment, Nicosia
We accepted the keys from abroad. The report and the call afterwards gave us a list the contractor could not argue with, and a re-inspection confirmed what was actually fixed.
Andreas, Detached house, Larnaca district

Who we are

CheckIT is an independent pre-handover inspection company based in Limassol and working across Cyprus. We are hired by the buyer and answer only to the buyer. No ties to developers, agents or contractors.

What we do

We find the defects in your new apartment before you accept the keys. Uneven floors, terraces that do not drain, damp behind the tiles, sockets without earthing: found before handover, they are fixed at the developer's cost. Found after, they are your cost and your time.

Who we help

Buyers of new-build apartments and houses in Cyprus: families moving in, relocating professionals, and investors who accept the keys remotely. Anyone with a handover date in the diary and no one on their side at the walkthrough.

How we help

Professional tools, not just eyes: laser level, thermal camera, moisture meter, endoscope, socket tester. 100+ checks per apartment. Every defect photographed, rated A, B or C and pinned on your plan. Report within 5 working days, written so the developer has to act on it.

What we check

What you see. What CheckIT sees.

Move the cursor across each picture, or drag the handle on a phone.

What you see: Floors
What CheckIT sees: Laser level: tile lippage over 3 mm that the eye does not catch
What you see What CheckIT sees
Floors Laser level: tile lippage over 3 mm that the eye does not catch
What you see: A/C
What CheckIT sees: Thermal camera: condensate leaking behind the wall under the unit
What you see What CheckIT sees
A/C Thermal camera: condensate leaking behind the wall under the unit
What you see: Electrics
What CheckIT sees: Thermal camera: overheating connection inside the distribution board
What you see What CheckIT sees
Electrics Thermal camera: overheating connection inside the distribution board
What you see: Drains
What CheckIT sees: Endoscope camera: construction debris left in the pipe
What you see What CheckIT sees
Drains Endoscope camera: construction debris left in the pipe
What you see: Lighting
What CheckIT sees: Lux meter: 150 lux in a living room, below the recommended level
What you see What CheckIT sees
Lighting Lux meter: 150 lux in a living room, below the recommended level

Illustrations of typical findings. In your report every finding is documented with a photograph of the reading taken in your apartment.

Tools

The tools we bring to an inspection

Professional instruments from Testo, Fluke, DeWalt, Stabila and Bosch. Readings are photographed with the instrument in frame, so the reading is the proof.

Thermal imaging camera, Testo

Thermal imaging camera

Testo

Damp behind finishes, leaks, insulation gaps, underfloor heating

Laser level 3x360, DeWalt

Laser level 3x360

DeWalt

Level and flatness of floors, walls and ceilings; falls to drains

Spirit level 200 cm, Stabila

Spirit level 200 cm

Stabila

Local level of floors, worktops, frames and built-in furniture

Socket tester with RCD test, Fluke

Socket tester with RCD test

Fluke

Polarity and earthing of every socket, RCD trip test

Multifunction installation tester, Fluke

Multifunction installation tester

Fluke

Insulation resistance, earth loop and RCD tests of the electrical installation

Vane anemometer, Testo

Vane anemometer

Testo

Air flow at extract and supply grilles, ventilation performance

Thermohygrometer, Testo

Thermohygrometer

Testo

Humidity, temperature and dew point in every room; mould risk

Non-invasive moisture meter, Testo

Non-invasive moisture meter

Testo

Moisture in walls, screeds and joinery without drilling or pins

Water flow gauge, Monument

Water flow gauge

Monument

Flow rate in litres per minute at every tap and shower

Endoscope inspection camera, Bosch

Endoscope inspection camera

Bosch

Inside drainage pipes, ducts and concealed spaces behind finishes

Refrigeration smart probe set, Testo

Refrigeration smart probe set

Testo

Refrigerant temperature and pressure in A/C systems, leakage check

Laser distance meter, Bosch

Laser distance meter

Bosch

Room dimensions, openings and guarding heights against the plan

The list of tools is for illustrative purposes. The exact list and models depend on the inspection scope and availability. Also on site: tile inspection hammer, straightedge, lux meter.

Real defects

What we found in recent inspections

Examples of recently inspected apartments and offices. Client and project details removed.

Spirit level on a veranda floor showing no fall towards the drain
Veranda floor laid without fall to the drain
63defects recorded

2-bedroom apartment, Limassol

  • Veranda floor laid without fall to the drain: standing water after rain
  • No waterproofing under the balcony door, open gap for water into the floor build-up
  • All sockets in one room dead; connections in the distribution board needed rechecking
  • Kitchen island top out of level by 5 to 6 mm
  • Entrance door with a 7 to 9 mm gap to the floor

Outcome: Report handed to the developer before signing, every item numbered and pinned on the plan.

Carpenter's square held in a wall corner showing it is out of square
Wall corner out of square
11defect groups, 40+ photographs

Detached house, Pyla, Larnaca district

  • Wall corners out of square, visible in tapered cuts of the floor finish
  • Wall surfaces out of plane in several rooms
  • Floor with local high and low spots in the living room and kitchen
  • Waterproofing missing above the parking niche; roof waterproofing incomplete
  • Built-in furniture unsecured in one location

Outcome: Inspected before the electrical installation was complete; a second visit covered the electrics.

Damaged wall corner above a skirting in a new office fit-out
Damaged corner and unfinished skim coat
43defects recorded

Office fit-out, new business centre

  • Damaged and dirty wall surfaces after the trades left
  • Poorly finished skim coat and paint in corridors
  • WC units in the facilities not fixed to the wall
  • Crack in a wall at a joint
  • Electrical tray not fixed square to the structure

Outcome: Commissioned by the occupier before accepting the works from the fit-out contractor.

What you receive

Every defect documented so the developer cannot argue with it.

Page from a CheckIT report: defect entry with plan location and two photographs of a spirit level on a veranda floor
Defect entry

One entry per defect: ID, the finding in plain words, the room, the trade responsible and an open or fixed status. Photographs are taken with the instrument in frame, so the reading is the proof.

Page from a CheckIT report: apartment floor plan with 63 numbered defect pins
Defect plan

Every defect pinned on your apartment plan and numbered to match the register. Clusters of pins show where the workmanship is weakest. That page carries the most weight in the handover meeting.

  • Defect register with photos, rated A / B / C
  • Every defect pinned on your floor plan
  • A PDF you forward to the developer as-is
  • Issued within 5 working days, in English, Greek, Russian, Ukrainian, Hebrew or Chinese

Extract from a real report: 2-bedroom apartment, Limassol, July 2026. Client and project details removed.

Calculate the price
Price

One service. Add only the checks you need.

Choose the property and location, see what the standard package includes, then add only the checks you need. Prices exclude VAT (19%). Payment on delivery of the report.

Property
Location
Standard package included

1-bedroom apartment in Limassol: €650 + VAT. Every item below is included.

  • Walk-through of every room, balcony, terrace and storage with a 100+ point checklist
  • Floors: chips, cracks, lippage, hollow tiles by tap test, damaged laminate or parquet
  • Level and flatness of floors and walls with laser level and 2 m spirit level
  • Walls and ceilings: cracks, plaster defects, paint finish, stains
  • Doors: alignment, closing, gaps, locks, hinges and handles
  • Windows and balcony doors: operation, seals, glass condition, sill drainage
  • Shower enclosures and sanitary ware: fixing, sealing, damage
  • Kitchen and built-in furniture: alignment, doors and drawers, worktop level, fixing
  • Balconies and terraces: falls to drains, tiling, balustrade height and fixing
  • Water: every tap and shower run, visible leaks, drainage speed, trap seals
  • Switches and lighting checked for operation and damage
  • A/C units switched on in cooling and heating, condensate drainage observed
  • Ventilation and extract fans: visual defects, operation
  • Sealant and visible waterproofing lines in wet areas
  • Every defect photographed, rated A / B / C and pinned on the plan
  • PDF report within 5 working days, in English, Greek, Russian, Ukrainian, Hebrew or Chinese
Choose a level
Additional checks
Chat on WhatsApp